Wenzhou pump and valve research institute visited kaixim valve
on August 9, 2014, President Yang Guolai and chief engineer Zhang xiheng of the pump and valve research institute visited kaixim valve and had a discussion with Chairman Zhang Chengxuan and chief engineer Zhang Yanbin. The two sides had an in-depth exchange on the processing technology and performance of the 904L hard sealed ball valve. At the same time, President Yang Guolai and chief engineer Zhang xiheng of the pump and valve research institute visited Kasim valve and had a discussion with Chairman Zhang Chengxuan and chief engineer Zhang Yanbin on the digital quantification of PVD superhard resistance in the surface engineering laboratory on August 9, 2014, which must ensure that the system is preheated for more than 20 minutes. The two sides had an in-depth exchange on the processing technology and performance of the hard seal ball valve made of 904L material. At the same time, President Yang reported on the progress of PVD ultra hard corrosion-resistant ball valve whose surface engineering experiment is the abbreviation room of China Metrology Accreditation, and discussed the possibility of applying PVD technology to 904L ball valve
During the period of, President Yang also introduced the specific situation of Wenzhou Graduate School of Lanzhou University of technology 28 (5) 033549016180 d=3a and the development of the science and technology park. Chairman Zhang Chengxuan agreed with the graduate practice activities and hoped to send more graduate students to strengthen the scientific research strength of enterprises, strengthen the cooperation between industry, University and research, and strengthen the connotation of scientific and technological cooperation
LINK
Copyright © 2011 JIN SHI